The project was a turn key project that was replacing the old control panels and renewing the control system to the current standard. The customer had a couple of demands that the new control system had to meet which were not possible in the old situation:
Main Content
A company in industrial automation and support.
How can we help you?
Our Projects
Ship to Shore Crane (Korea)
The customer needed to get support for lead- and commissioning engineer of the PLC software and frequency drive setup for six new to build ship to shore crane. The project was to write and design the PLC code and setup the frequency drive parameters based on the requirements and drawings for:
Tugger Winches
The customer needed support from an lead PLC engineer to update the controls for 12 Hydrolic Tugger winches. The old system was by relay technology and didn’t have an interlock between the different control locations to control a single Tugger.
Standardisation
The customer had difficulties completing projects within the calculated time and most of all “first time right”, all the project were copies from other projects or were build up from scarges which resulted in making the same mistakes over again. Also the challenge was to get new engineers up to speed within a short period […]